Contact

A no-obligation introduction

Call, email or send a WhatsApp message. I usually reply the same working day. Available for assignments in the Netherlands, Belgium and worldwide.

Direct

NameGert Geeve, CSCP
Phone+31 6 10 21 43 41
Emailgert.geeve@ucgroup.nl
AddressHan de Lignieplein 45
3249 BM Herkingen, the Netherlands
UC Groupucgroup.nl (partner)

Directions

Herkingen is on Goeree-Overflakkee, about 45 minutes from Rotterdam via the A29/N59 (exit Dirksland/Herkingen) and about an hour from Antwerp via the A4/N59. Parking in front of the door.

Send a message

Your details are used only to reply to this message and are not shared. Prefer direct contact? Call or message me.