Interim Logistics Manager · CSCP · partner at UC Group

Interim logistics manager for heavy lift, out-of-gauge and EPC projects

I take over the logistics of your EPC or industrial project: from chartering semi-submersibles and heavy-lift carriers to customs, laydown and last mile to site. Available at short notice in the Netherlands, Belgium and worldwide.

Hiring runs per project and exclusively through UC Group — whether you call it an interim or a freelance logistics manager. I work on EPC logistics and heavy transport as interim logistics manager Netherlands, interim logistics manager Belgium, and worldwide wherever the project is.

29semi-sub and heavy-lift carriers coordinated
>€20Msaved on shipping arrangements
3EPC partners managed on one project
25+ yrslogistics, chartering and warehousing

Services

Project logistics, heavy lift and interim management

As an interim project logistics manager and logistics consultant I take over the logistics of EPC projects: from the logistics execution plan and the tendering of transport contracts to the last module on its foundation. Alongside that I run interim assignments in warehousing and supply chain. All work runs exclusively through UC Group.

EPC project logistics

EPC project logistics for owner or EPC contractor: logistics execution plan, transport and packing procedures, Incoterms, insurance and customs strategy.

  • Logistics consultant EPC projects in oil, gas and chemicals
  • EPC contractor logistics and owner’s logistics representative
  • Materials management EPC project, from procurement to site
More →

Heavy lift & out-of-gauge

Heavy lift logistics and out-of-gauge transport, from forty-tonne pieces to modules over a thousand tonnes, by road, inland waterway and sea.

  • Heavy lift transport: route surveys, permits, escorts
  • Project cargo logistics and breakbulk shipping
  • Heavy lift consultant on transportability and engineering reviews
More →

Chartering & project cargo

Chartering project cargo from module yard to marshalling yard and site, with heavy lift vessel charter, part charters and breakbulk bookings.

  • Vessel selection, part charter and full heavy lift vessel charter
  • Surveyors, lashing, securing and sea fastening
  • Project cargo Rotterdam, Antwerp and the North Sea ports
More →

Offshore wind & energy transition

Offshore wind logistics and LNG project logistics: foundations, towers, nacelles and modules through port, marshalling yard and installation vessel.

  • Offshore wind logistics manager for pre-assembly and marshalling
  • Port selection, quay capacity and laydown planning
  • Logistics contractor oil and gas projects and the energy transition
More →

Warehouse, WMS & supply chain

Interim supply chain manager for warehouse operations and supply chains, including system implementations and network redesign.

  • WMS implementation as interim manager, plus TMS implementation
  • S&OP implementation and rebuilding inventory management
  • Warehouse layout optimisation and process redesign
More →

Interim management & crisis

Interim logistics management on departure, growth or crisis: temporary replacement, reorganisation or rescue plan when the knowledge or capacity is missing internally.

  • Interim manager heavy lift or project logistics, available within weeks
  • Project logistics consultant for review of plan, contract and rates
  • Removing risk and taking teams along in the change
More →

Case

INEOS Project One, Antwerp

From April 2023 to December 2025 I was Logistics Manager of Project One, the largest chemical investment in Europe in 25 years (€4 billion). Together with three EPC partners (Técnicas Reunidas, Wood and Technip Energies), modules had to move from Abu Dhabi, Hamriyah, Thailand, China and the Philippines to Antwerp.

By revising the shipping arrangements engineered by the EPC partners I saved more than €20 million. Those savings absorbed the extra cost of sailing around the Cape of Good Hope during the Red Sea crisis, which would otherwise have exceeded the budget.

Read the full case

Semi-submersible carriers14
Heavy-lift carriers15
Load ports5
Savings on shipping>€20M
Gert Geeve wearing a safety helmet on a project site

About Gert

Gert Geeve, CSCP

Interim logistics manager since April 2023 after more than 25 years in logistics, shipping chartering (air, deep sea, containers, breakbulk and project cargo), heavy-lift operations, warehousing and category management. Finalist Dutch Logistics Manager of the Year. Based in Herkingen (South Holland), working in the Netherlands, Belgium and at remote locations worldwide. As a partner at UC Group I work alongside interim specialists in logistics, supply chain and production.

APICS CSCPFinalist Logistics Manager of the Year (NL)NL · BE · worldwidePartner at UC Group

View the full resume

Frequently asked

What clients want to know up front

What does an interim logistics manager do on an EPC project?

Writes the logistics execution plan, sets up contracts with forwarders and carriers, safeguards Incoterms, customs and insurance, and runs execution from module yard to foundation, so logistics stays within the project's budget and schedule.

What is the difference between a semi-submersible and a heavy-lift carrier?

A semi-submersible ballasts down so floating modules or heavy cargo can be floated on; a heavy-lift carrier lifts cargo with its own cranes. The choice depends on weight, dimensions, load port and cost per voyage.

How soon are you available and for how long?

Usually within a few weeks, for assignments from three months to several years, on an interim or consultancy basis, on site or hybrid.

Do you work outside the Netherlands and Belgium?

Yes. The INEOS project had load ports in the Middle East and Asia; I work where the project is, including remote locations.

Contact

A no-obligation introduction?

Call, email or send a WhatsApp message. I usually reply the same working day.

Gert GeeveHan de Lignieplein 453249 BM Herkingen, the Netherlands+31 6 10 21 43 41 (WhatsApp)gert.geeve@ucgroup.nl